系统集成项目管理工程师计算类试题真题详解

系统集成项目管理工程师计算类试题真题详解 下载 mobi epub pdf 电子书 2024


简体网页||繁体网页
耿洪彪 著



点击这里下载
    


想要找书就要到 图书大百科
立刻按 ctrl+D收藏本页
你会得到大惊喜!!

发表于2024-10-05

类似图书 点击查看全场最低价

图书介绍

出版社: 清华大学出版社
ISBN:9787302445722
版次:1
商品编码:12043312
包装:平装
丛书名: 全国计算机技术与软件专业技术资格 水平 考试参考用书
开本:16开
出版时间:2016-09-01
用纸:胶版纸
页数:148
字数:190000
正文语种:中文


相关图书





图书描述

编辑推荐

  系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质必需的证书,是历年软考报名中的热点。

  系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生的噩梦和难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,计算题的对错将决定考试成败。

  全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题。

  书中系统、详细地解析了这些复杂计算题,详细到每个步骤,同时配有考点回顾和计算公式等相关内容,一切为了考生和读者能够真正吃透计算题。

  考生读懂本书后,可以透彻地掌握考试涉及的所有计算类考点,并能清晰理解考试的命题规律与命题思路,可以大幅提高考试的通过率。


内容简介

  系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。

  古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。

  本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切为考生和读者能够真正吃透计算题服务。

  参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。

内页插图

目录

第1章 进度管理计算题 ······································································1

1.1 单代号网络图 ················································································1

1.1.1 知识点回顾 ·····················································································1

1.1.2 历年试题解析 ··················································································2

1.2 双代号网络图 ················································································4

1.2.1 知识点回顾 ·····················································································4

1.2.2 历年试题解析 ··················································································5

1.3 关键路径法 ···················································································6

1.3.1 知识点回顾 ·····················································································6

1.3.2 历年试题解析 ··················································································8

1.4 进度压缩 ·····················································································14

1.4.1 知识点回顾 ···················································································14

1.4.2 历年试题解析 ················································································14

1.5 资源优化 ·····················································································18

1.5.1 知识点回顾 ···················································································18

1.5.2 历年试题解析 ················································································19

1.6 PERT估算 ···················································································22

1.6.1 知识点回顾 ···················································································22

1.6.2 历年试题解析 ················································································23

1.7 进度估算 ·····················································································28

1.7.1 知识点回顾 ···················································································28

1.7.2 历年试题解析 ················································································28

1.8 进度综合案例 ···············································································33

1.8.1 (2009上半年,下午)试题二···························································33

1.8.2 (2011下半年,下午)试题二 ···························································35

1.8.3 (2013上半年,下午)试题二···························································37

·VI·

第2章成本管理计算题 ···································································· 40

2.1 成本类型 ·····················································································40

2.1.1 知识点回顾 ··················································································· 40

2.1.2 历年试题解析 ················································································ 40

2.2 成本估算 ·····················································································45

2.2.1 知识点回顾 ··················································································· 45

2.2.2 历年试题解析 ················································································ 46

2.3 成本预算 ·····················································································50

2.3.1 知识点回顾 ··················································································· 50

2.3.2 历年试题解析 ················································································ 51

2.4 挣值管理 ·····················································································55

2.4.1 知识点回顾 ··················································································· 55

2.4.2 历年试题解析 ················································································ 59

2.5 成本预测 ·····················································································68

2.5.1 知识点回顾 ··················································································· 68

2.5.2 历年试题解析 ················································································ 69

2.6 成本综合案例 ···············································································72

2.6.1 (2009下半年,下午)试题四··························································· 73

2.6.2 (2010上半年,下午)试题二··························································· 74

2.6.3 (2010下半年,下午)试题二 ·························································· 75

2.6.4 (2011 上半年,下午)试题二 ··························································· 77

2.6.5 (2012下半年,下午)试题三··························································· 79

2.6.6 (2013下半年,下午)试题四··························································· 85

2.6.7 (2014上半年,下午)试题四··························································· 87

第3章进度成本综合案例题 ······························································ 89

3.1 (2012上半年,下午)试题二 ··························································89

3.2 (2014下半年,下午)试题一 ··························································92

3.3 (2015上半年,下午)试题一 ··························································94

3.4 (2015下半年,下午)试题四 ··························································98

·VII·

第4章风险管理计算题 ···································································103

第5章招标采购计算题 ···································································108

5.1 历年试题解析 ············································································· 108

5.2 综合案例 ··················································································· 120

5.2.1 (2009下半年,下午)试题一··························································120

5.2.2 (2013下半年,下午)试题二··························································122

5.2.3 (2015下半年,下午)试题一··························································123

第6章立项管理计算题 ···································································125

第7章信息技术计算题 ···································································129

第8章集成资质计算题 ···································································139



系统集成项目管理工程师计算类试题真题详解 下载 mobi epub pdf txt 电子书 格式

系统集成项目管理工程师计算类试题真题详解 mobi 下载 pdf 下载 pub 下载 txt 电子书 下载 2024

系统集成项目管理工程师计算类试题真题详解 下载 mobi pdf epub txt 电子书 格式 2024

系统集成项目管理工程师计算类试题真题详解 下载 mobi epub pdf 电子书
想要找书就要到 图书大百科
立刻按 ctrl+D收藏本页
你会得到大惊喜!!

用户评价

评分

经常京东网购,总有大量的包裹收,感觉写评语花掉了我大量的时间和精力! 所以在一段时间里,我总是不去评价 或者随便写写! 但是,我又总是觉得好像有点对不住那些辛苦工作的卖家客服、仓管、老板。 于是我写下了一小段话,给我觉得能拿到我五星好评的卖家的宝贝评价里面以示感谢和尊敬! 首先,宝贝是 性价比很高的,我每次都会先试用再评价的,虽然宝贝不一定是最好的,但在同等的价位里面绝对是表现最棒的。 京东的配送绝对是一流的,送货速度快,配送员服务态度好,每样东西都是送货上门。 希望京东能再接再厉, 做得更大更强。

评分

怪不得评论说坑呢,就一个小册子,半家福给大家一个参考吧!

评分

给公司建立图书馆购买的书籍

评分

正版书籍,纸张印刷质量好,一共四本,很满意!

评分

包装不是很好,书的角坏了。

评分

此用户未填写评价内容

评分

京东自营商品送货上门速度快,商品质量有保障。是正版图书,价格便宜。此书适合自学考试使用。

评分

昨天下单,24h到手,物流快!书的质量还行,希望有帮助~~

评分

有防盗水印,包括质量上看起来应该是真的。不错。

类似图书 点击查看全场最低价

系统集成项目管理工程师计算类试题真题详解 mobi epub pdf txt 电子书 格式下载 2024


分享链接








相关图书


本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度google,bing,sogou

友情链接

© 2024 book.teaonline.club All Rights Reserved. 图书大百科 版权所有